Foldable Installation PV Panel Brackets Wholesale Middle East
Home » Products » Zn-Al-Mg Photovoltaic Bracket » Foldable Installation PV Panel Brackets Wholesale Middle East

PRODUCT CATEGORY

Contact Us

Foldable Installation PV Panel Brackets Wholesale Middle East

Surface treatment: galvanized zinc aluminum magnesium
Steel grade: S350\S420\S450
Processing: Ordinary processing and custom processing are available
Other accessories or requirements can be ordered.
Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Product Details:

Item

zn-al-mg photovoltaic bracket

Surface Treatment

Zinc aluminum magnesium coating

Steel grade

S350\S420\S450

Processing

Ordinary processing and custom processing are available

Terms of payment

L/C, T/T

Delivery

7-30days

Supplying BV or SGS Inspection if the client needs it.

Other accessories or requirements can be ordered.


Foldable Installation PV Panel Brackets Wholesale Middle East3


The steps for Installation PV Panel Brackets are as follows:

1. Installation of columns and inclined beams: First connect the columns and inclined beams on the ground with triangular connectors, and then tighten them with bolts. Then lift the assembled column and inclined beam combination, and place the column on the pile top sleeve. Use a slope measuring instrument to make adjustments on the inclined beam. After adjusting the height, tighten the sleeve bolts. Fix the uprights and diagonal beams at both ends.

2. Installation of purlins: Use bolts to fix the purlins to the inclined beams, and hang long thin wires on the upper and lower ends of the inclined beams. Then adjust the height of the connector between the columns and the inclined beams between units according to the height of the thin line, and fix the columns.

3. Installation of diagonal braces: One end is fixed on the diagonal beam with a triangular connector, and the other end is connected to the column with a diagonal brace hoop. The front and rear diagonal braces are installed in the same way.

4. Installation of modules: Pre-tighten the clamp first, then position the photovoltaic module and tighten the clamp. Install the photovoltaic panels piece by piece starting from one side and tighten them with bolts. After installation, check whether the direction and position of the control box on the back of the photovoltaic panel are consistent. Install a protective ground wire and a return box. Install the cables to the junction box and secure the cables with zip ties.

5. Installation of tie rods: Straight tie bars and rear column tie rods can be installed after the components are installed. First pass the straight pull strip through the reserved hole, and then tighten it with bolts. To install the rear uprights and inter-column tie rods, first connect the rear upright tie rods to the inter-column tie rod hoops, then connect the inter-column tie rod hoops to the rear uprights, and finally tighten them with bolts. Install the high hoop first, then the low hoop. Finally check the tightness of the foldable pv panel brackets.

If you have any questions of Foldable Installation PV Panel Brackets Wholesale Middle East, pls connect to our sales.

Previous: 
Next: 
+86-182-2202-9592
No.1 Science and Technology Road, DaQiuZhuang Industrial Zone, Jinghai, Tianjin, China 301606

About Us

It is located in Daqiuzhuang, Tianjin, China's largest steel pipe production base, covering an area of 1,450 acres and with a net asset of 2.3 billion.

Quick Links

Product Category

Contact Us
Copyright ©️ 2024 Tianjin Yuantai Derun Steel Pipe Manufacturing Group Co., Ltd. All Rights Reserved. Sitemap. Support by leadong.com. Privacy Policy.