Metal Zn-Al-Mg Photovoltaic Bracket
Home » Products » Zn-Al-Mg Photovoltaic Bracket » Metal Zn-Al-Mg Photovoltaic Bracket

PRODUCT CATEGORY

Contact Us

Metal Zn-Al-Mg Photovoltaic Bracket

Availability:
Quantity:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Product Details:

Item

Zinc Aluminum Magnesium Solar Photovoltaic Support

Surface Treatment

Galvanized zinc aluminum magnesium

Steel grade

S350\S420\S450

Processing

Ordinary processing and custom processing are available

Terms of payment

L/C, T/T

Delivery

7-30days

Supplying BV or SGS Inspection if the client needs it.

Other accessories or requirements can be ordered.


The production process of zinc-aluminum-magnesium photovoltaic brackets generally includes the following steps:

1. Design planning: Design the structure, size and layout of the bracket according to the size, weight and installation requirements of the photovoltaic panels. Comprehensive planning and design should be carried out taking into account the climate conditions, topography and other factors of the installation area.

2. Material preparation: Choose high-quality zinc-aluminum-magnesium alloy material as the main material of the bracket. Prepare required metal pipes, connectors, bolts and nuts, etc.

3. Cutting processing: Cut the metal materials according to the design drawings. Processing operations such as cutting, grinding, and bending can be performed using hand tools or mechanical equipment as needed.

4. Welding assembly: According to the design requirements, use welding equipment to assemble the cut metal materials. The welding process requires that the solder joints are firm, airtight and comply with relevant standards.

5. Surface treatment: Surface treatment of the welded brackets generally includes processes such as rust removal, spraying anti-corrosion paint or electroplating to enhance the corrosion resistance and aesthetics of the brackets.

6. Quality inspection: Conduct quality inspection on the produced stents to ensure that the quality of the stents meets relevant standards and specifications. Including checking solder joint quality, dimensional accuracy, surface treatment quality, etc.

7. Installation and debugging: Install the bracket and adjust its position to ensure the stability and appropriate tilt angle of the bracket. After installation, connect and debug the photovoltaic panels to ensure that the entire system is working properly.

The above is the general production process. The specific steps and processes may vary according to different production requirements and actual conditions. During the production process, you must pay attention to work safety and comply with relevant operating procedures and safety requirements.


Previous: 
Next: 
+86-182-2202-9592
No.1 Science and Technology Road, DaQiuZhuang Industrial Zone, Jinghai, Tianjin, China 301606

About Us

It is located in Daqiuzhuang, Tianjin, China's largest steel pipe production base, covering an area of 1,450 acres and with a net asset of 2.3 billion.

Quick Links

Product Category

Contact Us
Copyright ©️ 2024 Tianjin Yuantai Derun Steel Pipe Manufacturing Group Co., Ltd. All Rights Reserved. Sitemap. Support by leadong.com. Privacy Policy.